20.11.2024

Construction Begins at the Wedau Sports School in Duisburg

After the conversion of the existing building, the prepared construction area was handed over to the shell construction contractor. The construction site is currently being set up with the shell structure and the laying of the underground pipes and foundation components is in preparation. This means that the first concrete will “flow” soon.



Zurück